This one was a whole lotta grinding, back in the 80’s the aggregate look was in, but not in 2014!! – We started the job with 3 days of grinding the entire surface down to a manageable level, but we still needed to build it up a little.

Once the grinding was completeIMAG1287, the cracks were open and repaired it was time to pressure wash and get it cleaned up for the next steps, the concrete overlay base coat we put it down by troweling it on with a magic trowel. The verticals we sprayed through a Hopper gun.

Now that our 2 base coat’s were in place we had to put down our top coat, once that was in place all that was left was to seal it all down with our Acrylic Sealer, we did add some shark grip additive to the sealer to give it some slip resistance, other than that it was a big job, but pretty simple in procedure.

 

Another Concrete Surface Saved and Beautified by Custom Concrete Design!

Hope you Enjoy the pictures and Video

MORE pictures located HERE!!

Call me for a FREE Estimate.

OR – You can Fill out this Convenient Contact form located HERE and I will Contact YOU!!

Thank you for Visiting my Website, come back again soon….

Rick LaFata
(573)-216-0930
rick@customconcretedesign.info
Custom Concrete Design

Facebook YouTube Twitter pinterest WordPress Flickr about.me Instagram

Tagged with:

Filed under: Acid Stained Concrete FloorsDecorative Concrete Flooring

Like this post? Subscribe to my RSS feed and get loads more!